Construction & Contracting

A progress payment is not the last three days of the month.

Quantities, work items, the payment summary and the approval chain in one system. Whatever gets built on site is recorded the same day, so what comes out at month end is collected, not reconstructed.

Project progress · Residential Block BContract value ₺84,500,000 · 18 months
PlannedActual
123456789101112131415

At the end of month 9, actual progress is 11 points behind plan. You see that gap in the week it opens, not at month end — and that is when the recovery plan gets made.

9
Payments issued
60%
Cumulative works
₺44,180,000
Collected
₺6,520,000
Outstanding

The project and figures on screen are illustrative. On your own project, contract items, unit rates and the programme are set up from your data.

The summary is the payment on a single page.

How much of each item was built, how much was paid in previous applications, what is being claimed now. The supervising engineer approves from this page; if there is a dispute you drill into the item.

Payment application 9 · May
ItemWorkUnit rateThis periodAmount
15.140Reinforced concrete formwork₺480/m²1,240 m²₺595,200
16.058C30 concrete pour₺3,850/m³412 m³₺1,586,200
23.014Ribbed reinforcement steel₺34,200/t38.4 t₺1,313,280
27.501Blockwork · aerated concrete₺620/m²980 m²₺607,600
27.581Internal plaster₺310/m²1,860 m²₺576,600
Works this period₺4,678,880
Price adjustment₺218,400
Withholding and deductions−₺187,155
Retention (5%)−₺233,944
Payable on this application₺4,476,181

Quantities are entered on site, totalled in the office.

The site manager enters the work from a phone; photograph and location are attached automatically. Nobody hunts for a notebook at month end, and nobody writes from memory.

Site entry

Work is entered against its item code on the day it is done, with a photograph and time stamp attached.

Block and floor breakdown

The same item is tracked separately per block. How much is finished on which floor shows item by item.

Supervisor approval

The supervising engineer approves the entered quantity or asks for a correction — and the request stays on record too.

Into the application

Approved quantities flow into the payment summary by themselves. The copy-and-paste-into-Excel stage disappears.

Whose desk is the application sitting on?

The application passes through an approval chain. Once it is visible how long it has waited with whom, the waiting shortens on its own — nobody wants to be the name on the list.

Site manager

Quantities collected, summary prepared

2 days

Supervising engineer

Site check and quantity approval

3 days

Technical office

Item code and rate check

1 day
4

Consultant

Independent review and approval

waiting 6 days
5

Employer

Payment approval

Issuing an application is not receiving the money.

In contracting, cash pressure usually comes not from thin margins but from the days between issuing and being paid. The table below is illustrative; on your project it is built from your real day counts.

ApplicationIssuedApprovedPaidDays
Application 628 Feb14 Mar09 Apr41 days
Application 731 Mar12 Apr28 Apr28 days
Application 830 Apr22 May18 Jun49 days
Application 931 MayIn approval
Average time to payment39 days

With an average 39-day delay, a monthly application of around 4.5 million means roughly 6 million lira of permanently tied-up working capital. Knowing that number is what lets you set subcontractor payments and material purchases against it.

The rest of the site

Subcontractor applications

Subcontractor applications run beneath the main one. How much work was given and how much paid shows item by item.

Price adjustment

Calculated by the formula defined in the contract. Enter the index values and the calculation falls out on its own.

Programme tracking

Planned against actual works. Which item the delay comes from appears as a list.

Multiple projects

Concurrent projects are tracked separately, with progress and cash position for all of them on the management screen.

Attachments and annexes

Quantity sheets, attachments and photographs are appended to the application file. What an audit asks for is inside the file.

Revision history

Every correction to an application is kept with who made it and when.

Questions

Do we key in unit rates by hand?

You load the contract's schedule of rates once; after that choosing an item brings its rate with it. If you use public-sector item codes those schedules can be imported too.

Do we have to give up Excel?

You don't have to, though that is the aim. The payment summary and quantity sheets export to Excel — you send the consultant or employer the format they are used to. Inside the business, the system becomes the single source.

The site has weak internet — will on-site entry work?

The phone app works offline; entered quantities and photographs accumulate on the device and upload when there is signal. That is a precondition for site entry being usable at all, and it was designed in from the start.

Does the system know our price adjustment formula?

We set up whichever formula your contract defines. You enter the index values or they are pulled from a defined source; the calculation is automatic, but verifying the input remains your responsibility.

Can our subcontractors log in?

If you want them to. A subcontractor can be given rights to see and enter only their own work. If you'd rather not, the technical office enters it and the flow is unchanged.

How many projects and users?

No limit on either. Growing does not require additional licences; setup is one-off.

Let's set up
one project's applications together.

Tell us the contract size, how many item codes and how many sites you run. We'll build a demo on your own schedule of rates.

Pricing

One price for every product

Every solution on this site is the same price. No module surcharges, no per-user fees, no setup invoice.

MonthlyUntil year end
3,500 ₺2,500 ₺/ month

Campaign price, valid through 31 December 2026. Cancel any time.

Annual, single paymentSave 50%
15,000 ₺/ year

Works out to 1,250 ₺ per month. Paid once, no monthly invoice.

Included in both options

  • All modules, no per-feature pricing
  • Setup, data migration and training
  • Updates and technical support
  • Hosting, SSL and daily backup
Get startedTell us your business, we set it up and show you a working demo.